South Sudan — Tonj South Village Assessment Survey (4 April - 17 May 2022)

Share

Download

Share

Contact
DTM South Sudan, SouthSudanDTM@iom.int
Language
English
Location
South Sudan
Period Covered
Apr 04 2022
May 17 2022
Activity
  • Mobility Tracking
  • Site Assessment

This Tonj South Village Assessment Survey covers a period from 4 April to 17 May 2022. Notably, it was found that 94% of administrative buildings, 90% of religious buildings, and 88% water points are functional. On the other hand, all of the assessed market facilities were found to be functional.