Afghanistan — Drought Response Situation Report (8 March 2019)

Share

Télécharger

Share

Contacter
DTMAfghanistan@iom,int
Langue
English
Emplacement
Afghanistan
Période couverte
Sep 09 2018
Mar 08 2019
Activité
  • Flow Monitoring

Through Flow Monitoring Points (FMPs) installed on major routes connecting to Herat City, IOM’s Displacement Tracking Matrix (DTM) has been monitoring inflows of drought-affected IDPs, since 9 September 2018. This report presents cumulative information as of 8 March 2019.