Asia and the Pacific

Share

  • Active DTM operation
  • Past DTM operation

Para obtener resultados de búsqueda más avanzados, vaya a la Página de búsqueda avanzada de informes
Mongolia - Population distribution as of January 2020 in soums with level of risk of Dzud under the EAP (Round 6)

Important note: Population assessment was completed in 330 soums, but did not include data collection in Ulaanbaatar. This map therefore does not contain population numbers for Ulaanbaatar.

Mongolia – Flow Monitoring in Ulaanbaatar (COVID-19 Preparedness) – Situation Report 1 (28 February 2020)

To increase its preparedness for an eventual response to COVID-19, the Governor’s Office of the Capital City has requested the assistance of IOM Mongolia to monitor all  incoming and outgoing flows of people by implementing its Displacement Tracking Matrix (DTM) methodology.

МОНГОЛ УЛС: COVID - 19 ҮЕИЙН БЭЛЭН БАЙДАЛ УЛААНБААТАРЫН ШАЛГАН НЭВТРҮҮЛЭХ ТОВЧООДЫН УРСГАЛ ХӨДӨЛГӨӨНИЙ ТАНДАЛТ - ТАЙЛАН 4 (2020-03-02)

To increase its preparedness for an eventual response to COVID-19, the Governor’s Office of the Capital City has requested the assistance of IOM Mongolia to monitor all  incoming and outgoing flows of people by implementing its Displacement Tracking Matrix (DTM) methodology.

Mongolia – Flow Monitoring in Ulaanbaatar (COVID-19 Preparedness) – Situation Report 7 (05 March 2020)

To increase its preparedness for an eventual response to COVID-19, the Governor’s Office of the Capital City has requested the assistance of IOM Mongolia to monitor all  incoming and outgoing flows of people by implementing its Displacement Tracking Matrix (DTM) methodology.

МОНГОЛ УЛС: COVID - 19 ҮЕИЙН БЭЛЭН БАЙДАЛ УЛААНБААТАРЫН ШАЛГАН НЭВТРҮҮЛЭХ ТОВЧООДЫН УРСГАЛ ХӨДӨЛГӨӨНИЙ ТАНДАЛТ - ТАЙЛАН 9 (2020-03-07)

To increase its preparedness for an eventual response to COVID-19, the Governor’s Office of the Capital City has requested the assistance of IOM Mongolia to monitor all  incoming and outgoing flows of people by implementing its Displacement Tracking Matrix (DTM) methodology.

Mongolia - Population distribution as of January 2020 in soums with level of risk of Dzud under the EAP (Round 6)

Important note: Population assessment was completed in 330 soums, but did not include data collection in Ulaanbaatar. This map therefore does not contain population numbers for Ulaanbaatar.

Flow Monitoring Surveys: Insights into the Profiles and Vulnerabilities of Cambodian Migrants to Thailand (Round Two)

From mid-March until mid-August 2019, a total of 5,630 Cambodian nationals were surveyed in the provinces of Battambang and Banteay Meanchey, of whom 5,625 were identified as migrant workers. Migrants were categorized in two different groups.

Mongolia – Flow Monitoring In Ulaanbaatar (COVID-19 Preparedness) – Situation Report 90 (1 June 2020)

The Mongolian Government has taken early and very active measures to prevent and stop an eventual spread of the COVID-19.

Mongolia — Population Distribution As Of DTM Round 5 (January - March 2019) In Soums With Very High And High Level Of Risk Of Dzud Under The EAP January 2020

Population distribution as of DTM Round 5 (Jan. - March 2019) in soums with very high and high level of risk of Dzud under the EAP January 2020.

Flow Monitoring Surveys: Insights into the Profiles and Vulnerabilities of Cambodian Migrants to Thailand (Round 1)

From mid-March until end-May 2019, a total of 3,127 Cambodian nationals were surveyed in the provinces of Battambang and Banteay Meanchey, of whom 3,122 were identified as migrant workers. The 3,122 migrant workers were categorized in two different migrant groups.

Papua New Guinea - Site Profile: Deos-Tinputz (January 2020)

Deos-Tinputz experienced a King Tide at around 2000Hrs on 03 January 2020, leading to the displacement of the local community members who fled to higher ground for safety.

افغانستان — ارزیابی نیازمندی های مبتنی بر جامعه: هلمند، دوره ۱ :: می— جون ۲۰۱۹

سیستم ردیابی بیجاشدگان (DTM) از ماه می الی جون سال ۲۰۱۹ در هماهنگی با وزارت مهاجرین و عودت کنندگان (MoRR) یک برنامه آزمایشی ارزیابی نیازمندی های مبتنی بر جامعه (CBNA) را به عنوان بخش جدایی ناپذیر از ارزیابی بنیادی تحرکات (BMA) در ولایت هلمند آنج

Afghanistan — Community-Based Needs Assessment: Uruzgan, Round 1 (May — June 2019)

In coordination with the Ministry of Refugees and Repatriation (MoRR), from May through June 2019, DTM in Afghanistan piloted a Community-Based Needs Assessment (CBNA) in Uruzgan, intended as an integral component of DTM's Baseline Mobility Assessment to provide a more comprehensive view of multi

Afghanistan — Community-Based Needs Assessment: Nimroz, Round 1 (May — June 2019)

In coordination with the Ministry of Refugees and Repatriation (MoRR), from May through June 2019, DTM in Afghanistan piloted a Community-Based Needs Assessment (CBNA) in Nimroz, intended as an integral component of DTM's Baseline Mobility Assessment to provide a more comprehensive view of multi-

افغانستان — ارزیابی نیازمندی های مبتنی بر جامعه: نیمروز، دوره ۱ :: می— جون ۲۰۱۹

سیستم ردیابی بیجاشدگان (DTM) از ماه می الی جون سال ۲۰۱۹ در هماهنگی با وزارت مهاجرین و عودت کنندگان (MoRR) یک برنامه آزمایشی ارزیابی نیازمندی های مبتنی بر جامعه (CBNA) را به عنوان بخش جدایی ناپذیر از ارزیابی بنیادی تحرکات (BMA) در ولایت نیمروز آن

Afghanistan — Community-Based Needs Assessment: Helmand, Round 1 (May — June 2019)

In coordination with the Ministry of Refugees and Repatriation (MoRR), from May through June 2019, DTM in Afghanistan piloted a Community-Based Needs Assessment (CBNA) in Helmand, intended as an integral component of DTM's Baseline Mobility Assessment to provide a more comprehensive view of multi

Philippines — Mindanao Earthquakes — Site Assessment — Report 6 — Round 5

On  15  December  2019 at 02:11  PM, a 6.9 magnitude earthquake  jolted the  municipality  of Matanao,  Davao  del  Sur  just  30  kilometers  away  from  Tulunan,  North  Cotabato  which suffered

Philippines — Mindanao Earthquakes — Baseline Site Assessment — Flash Report (Matanao Municioality) — 21 December 2019

On  15  December  2019 at 02:11  PM, a 6.9 magnitude earthquake  jolted the  municipality  of Matanao,  Davao  del  Sur  just  30   kilometers  away  from  Tulunan,  North  Cotabato  which

Philippines — Mindanao Earthquakes — Site Assessment — Report 5 — Round 4

This DTM report refers to the fourth round of site assessments conducted in North Cotabato and Davao del Sur from 25 to 27 November 2019. IOM deployed 3 enumerators included among 3 mobile CCCM support teams to roll out the DTM.

Papua New Guinea – Site Profile: Buin Conflict (December 2019)

Conflict-related violence resulted in the displacement of 479 people from Konnou Constituency in the Autonomous Region of Bougainville.

Philippines – Mindanao Earthquake – Site Profile R2 – Upper Bala Evacuation Center (November 2019)

Three major earthquakes hit North Cotabato on 16, 29 and 31 October 2019, at 6.3, 6.6 and 6.5 magnitudes, respectively.

Philippines – Mindanao Earthquake – Site Profile R2 – San Miguel Gym (November 2019)

Three major earthquakes hit North Cotabato on 16, 29 and 31 October 2019, at 6.3, 6.6 and 6.5 magnitudes, respectively.


Para obtener resultados de búsqueda más avanzados, vaya a la Página de búsqueda avanzada de conjuntos de datos

Para obtener resultados de búsqueda más avanzados, vaya a la Advanced map search page